Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Méthode chemin critique")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 244

  • Page / 10
Export

Selection :

  • and

Criticism of CPM for projet planning analysis = Critique de l'utilisation de la méthode du chemin critique dans la planification d'un projetJAAFARI, A.Journal of construction engineering and management. 1984, Vol 110, Num 2, pp 222-233, issn 0733-9364Article

Unified activity network model = Modèle unifié de réseau d'activitéHENDRICKSON, C; ZOZAYA-GOROSTIZA, C.Journal of computing in civil engineering. 1989, Vol 3, Num 2, pp 192-200, issn 0887-3801Article

A CPM analysis of microbiology computerization project for hospital management information processingKWAK, N. K; LONG, D. A; SCHNIEDERJANS, M. J et al.Information processing & management. 1985, Vol 21, Num 2, pp 149-155, issn 0306-4573Article

Critical path identification in planning of winery wastewater plantSEMRA SIBER ULUATAM; IBRAHIM VOLKAN BODUR.International journal of environmental studies. 1993, Vol 43, Num 1, pp 39-49, issn 0020-7233Article

Monitoring concrete pavement construction project by CPM technique = Contrôle du projet de construction de chaussée en béton par la technique du CPMJOSHI, L. S.Journal of the Institution of Engineers. India. Civil Engineering Division. 1984, Vol 64, pp 201-207, issn 0020-336X, 4Article

CPM USE IN TOP 400 CONSTRUCTION FIRMSDAVIS EW.1974; PROC. AMER. SOC. CIV. ENGNG, J. CONSTR. DIV.; U.S.A.; DA. 1974; VOL. 100; NO 1; PP. 39-49; BIBL. 4 REF.Article

METHODES DE CHEMIN CRITIQUE: APPLICATION PRATIQUE A UN CASBRESSO P.1972; REV. METALLURG.; FR.; DA. 1972; VOL. 69; NO 9; PP. 561-577; ABS. ALLEM. ANGL. ITALSerial Issue

METHODES DE CHEMIN CRITIQUE: ETUDE COMPARATIVESADELER R.1972; REV. METALLURG.; FR.; DA. 1972; VOL. 69; NO 9; PP. 553-559; ABS. ALLEM. ANGL. ITALSerial Issue

The application of critical path methodology to the management of ship design programsCHAPPELL, J. P.Marine technology. 1991, Vol 28, Num 3, pp 113-128, issn 0025-3316Article

Evaluate risk and plan for the unforeseenTALAVERA, I. P. G.Hydrocarbon processing (International ed.). 2004, Vol 83, Num 2, pp 89-93, issn 0018-8190, 5 p., 1Article

Standardizing scheduling data exchangeEAST, E. W; KIM, S.Journal of construction engineering and management. 1993, Vol 119, Num 2, pp 215-225, issn 0733-9364Article

Critical path analysis and resource constrained project scheduling. Theory and practiceWILLIS, R. J.European journal of operational research. 1985, Vol 21, Num 2, pp 149-155, issn 0377-2217Article

Fuzzy critical path methodNASUTION, S. H.IEEE transactions on systems, man, and cybernetics. 1994, Vol 24, Num 1, pp 48-57, issn 0018-9472Article

Network scheduling variations for repetitive work = Variations dans la programmation d'un réseau pour des travaux répétitifsO'BRIEN, J. J; FREITZBERG, F. C; MIKES, W. F et al.Journal of construction engineering and management. 1985, Vol 111, Num 2, pp 105-116, issn 0733-9364Article

TECHNIQUES TO IMPROVE POWER PLANT PRODUCTIVITYSHURTZ S.1978; AMERICAN POWER CONFERENCE/1978/CHICAGO; USA; DA. 1978; 13 P.Conference Paper

CRITICAL PATH ANALYSIS IN PROJECT MANAGEMENT = ANALYSE PAR LA METHODE DU CHEMIN CRITIQUE DANS LA GESTION DE PROJETSRINIVAS PRASAD HS.1980; J. INST. ENG., INDIA, CIV. ENG. DIV.; ISSN 0373-1995; IND; DA. 1980; VOL. 60; NO 5; PP. 271-275; BIBL. 5 REF.Article

Kremlin: Like gprof, but for ParallelizationJEON, Donghwan; GARCIA, Saturnino; LOUIE, Chris et al.ACM SIGPLAN notices. 2011, Vol 46, Num 8, pp 293-294, issn 1523-2867, 2 p.Conference Paper

Using mathematics to improve ada compiled codeMAURER, Ward Douglas.Lecture notes in computer science. 2006, pp 191-202, issn 0302-9743, isbn 3-540-34663-5, 1Vol, 12 p.Conference Paper

Probabilistic methods with simulation help predict timing, costs of projectsWOOD, D.A.Oil & gas journal. 2001, Vol 99, Num 46, pp 79-83, issn 0030-1388Article

On parallelization of static scheduling algorithmsWU, M.-Y; SHU, W.IEEE transactions on software engineering. 1997, Vol 23, Num 8, pp 517-528, issn 0098-5589Article

Cost/time trade-off analysis for the critical path method : a derivation of the network flow approachBAKER, B. M.The Journal of the Operational Research Society. 1997, Vol 48, Num 12, pp 1241-1244, issn 0160-5682Article

New generation of planning structuresRUSSELL, A. D; WONG, W. C. M.Journal of construction engineering and management. 1993, Vol 119, Num 2, pp 196-214, issn 0733-9364Article

Construction contractor's claims analysis: an integrated system approach = Analyse des contentieux des entreprises du bâtiment: une approche par système intégréALKASS, S; HARRIS, F.Building research and information. 1991, Vol 19, Num 1, pp 56-64, issn 0961-3218, 9 p.Article

Who owns float? = Qui est le propriétaire du temps de flottement?HOUSEHOLDER, J. L; RUTLAND, H. E.Journal of construction engineering and management. 1990, Vol 116, Num 1, pp 130-133, issn 0733-9364Article

Resource leveling in construction by optimization = Egalisation des ressources dans la construction par optimisationCASA, S. M.Journal of construction engineering and management. 1989, Vol 115, Num 2, pp 302-316, issn 0733-9364Article

  • Page / 10